DESIGN AND CONSTRUCT :
The creation of a new iconic building for Ringwood

  • Mixed Use Development in Ringwood
  • The Development will provide a new brand new entertainment precinct in Ringwood over 3 levels, including a nightclub, beer garden and function space.
  • The Development has undertaken an intensive design process to ensure the building is an architectural landmark for Ringwood.
  • The project has been designed & documented by e+mc2 architectural firm
  • The project involves the construction of an all concrete 3 level building with an architectural facade
  • The removal of existing footings has been completed, our hoarding erected and site cut completed. The underpinning works have commenced, followed by the below ground service works and the ground floor concrete works
DESIGN AND CONSTRUCT :
5 X APARTMENT DEVELOPMENT (BALWYN NORTH)

  • This project is a unique development of 5 x modern apartments in Balwyn North
  • The development is a ‘design and construct’ project and will provide a new modern luxury residences
  • Jeniton has been involved during the documentation process providing build ability and costing advice.
  • The project is a limited collection of 5 luxury apartment residences in highly sought after Balwyn locale.
  • The apartments offer highly considered and convenient living for the modern world
  • The project involves the demolition of an existing house lot
  • Demolition works and the site cut have been completed, along with basement piling, capping beam, the bulk excavations and shotcrete works.
  • The basement civil works, basement slab and columns are completed and the structural concrete works well underway
NEW DWELLING:
New 3 level dwelling (Cremorne)

  • A three level modern home featuring a rooftop deck in Cremorne
  • A very challenging project given location and proximity to surrounding neighbours but we love a challenge
  • A limited new dwelling in highly sought after Cremorne locale for a family
  • Involves the demolition of an existing house to make way for a new beginning
  • Demolition, the below-ground plumbing works and the concrete slab are now completed. The structural framing, including timber and steel work is well underway